ssSolutionStore
Home / Guide
The SolutionStore collection

A stage-plan handoff checklist for directors and crew

By SolutionStore editors · November 10, 2026 · 2 min read

Before sending the plan, check its identity, counts, orientation, version, and open questions. A good handoff makes the next action clear.

We operate the products featured as our picks. This guide reflects our recommendations and publicly available product information; it is not an independent product test. Our disclosure.

Identify the event and the approved plan

Put the event name, performing group, performance date, and revision date where a crew member can see them immediately. State which way the audience faces and use consistent stage-direction labels. If there are multiple groups, number the plans in running order. Name a person who can resolve layout questions, and agree who can approve changes once setup begins.

Reconcile the picture and the equipment list

Count the chairs and stands on the final drawing, then compare them with the equipment request. Check large instruments, stools, risers, and any unusual objects individually. A roster change can affect the equipment order even if the overall shape of the chart looks similar. Mark items supplied by the ensemble separately from those expected from the venue, and resolve unknowns before load-in.

Make the document usable in the room

Open the exported file on the kind of device the recipient will use and print a sample at the intended size. Confirm names and notes are legible. Give the crew a dated PDF for reference and explain how further revisions will arrive. StageCred supports PDF and SVG export; we recommend beginning with a simple PDF handoff so recipients can review the plan without learning an editor.

Close the loop after distribution

Ask the stage lead to acknowledge the version and list any outstanding questions. At the walkthrough, confirm that physical obstructions and access routes match the assumptions in the drawing. Update the plan if the agreed arrangement changes, then explicitly retire the old version. For recurring performances, save the accepted layout as the starting point for the next event, while checking the new roster and venue requirements afresh.

Sources & further reading

Product details may change. Check the linked official pages before ordering or subscribing.

Keep exploring.

All guides ↗